Installing, operating and maintaining water treatment units in Baiji Thermal power plant.
Rehabilitation, installation new equipments in Rustamiyah waste water treatment project (stage 0,1,2) with...
Read more...
Constructing all fuel and water tanks (200-5000) m3 with all accessories in New Mulla Abdullah Gas Turbine project in Iraq, with CMEC China. (2000).
Mussaib Gas turbine project ...
Read more...
A. Boilers rehabilitation and maintenance (dismantling, retubing, welding, inspection and testing).
Taking part (contributing) in rehabilitating of boilers of Baiji Thermal power plant.(6X220 MW), ...
Read more...
Our Tools & Equipments
| Cranes | 25 Tons | 4 |
| Cranes | 50 Tons | 2 |
| Forklift | 5 Tons | 2 |
| Low-bed Trailers | 80 Tons | 2 |
| Semi Trailer | 30 Tons | 4 |
| Excavators | 150/210 HP | 2 |
| Wheel Loaders | 160/220 HP | 2 |
| Tractors | 90/80 HP | 10 |
| Lorries/w Cranes | 16/8 Tons | 6 |
| Lorries | 6/3 Tons | 12 |
| Water Tankers | 35000 G | 4 |
| Diesel Generators | 60 KVA | 4 |
| Stringing of Conductors | Set | 2 |
| Welding M/C | Set | 4 |
| Tool Box | Sets | 20 |
| Concrete Mixers | Sets | 6 |
| Pickups | No. | 6 |
| SUV 4X4 | No. | 4 |
Human Resources
| Electrical Engineers | 15 |
| Mechanical Engineers | 21 |
| Civil Engineers | 10 |
| Quality-Control Engineers | 8 |
| Safety Engineers | 10 |
| Technicians | 150 |
| Labors | 110 |
| Management Permanent | 7 |
Water Treatment & waste water Treatment| Company News Company News |
| Company News Company News Company News Company NewsCompany News Company NewsCompany News Company NewsCompany News Company NewsCompany News Company NewsCompany News Company News |
| Company News # 4 |
| PCC scope covers the Engineering, Project Management, Procurement and Construction phases of the EPC Projects where the best engineers are employed with an in-depth knowledge of the Iraqi electrical system and industries. They have vast experience with excellent track record in the Energy and Industry Sectors. |
| Company News # Two |
| PCC scope covers the Engineering, Project Management, Procurement and Construction phases of the EPC Projects where the best engineers are employed with an in-depth knowledge of the Iraqi electrical system and industries. They have vast experience with excellent track record in the Energy and Industry Sectors. |
| Company News # one |
| Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. |

Boilers rehabilitation and maintenance (dismantling, retubing, welding, inspection and testing)>>> Read More...