A. Boilers rehabilitation and maintenance (dismantling, retubing, welding, inspection and testing).
- Taking part (contributing) in rehabilitating of boilers of Baiji Thermal power plant.(6X220 MW), (1994 - 1997)
- Taking part in rehabilitating of boilers in Baghdad south power station. (2000-2001)
- Retubing and general maintenance for 40 fire tube boilers in different site inside the country. (1994-2002)
- Rehabilitation of two water tube boilers in North Oil Company. (2001)
B. Installing and making refurbishment for different type of pumps, valves and actuators.
- Refurbishment of main pumps and accessories for Baiji thermal power plant. (1994 - 1997)
- Refurbishment of different types of pumps in Baghdad south power plant. (2000 - 2001)
- Rehabilitation of five raw water main pumping stations in Baghdad, including eight pumps for each. (1994)
C. Installation works for different equipments in Al-Quds Gas Turbine plant, with Dong Fang China. (2000)
D. Rehabilitation of pumps, valves and actuators in Baiji Thermal Power Plant and Daura power station with WIER Services/UK, Bachtel/USA. (2003-2004)
E. Excuting of fire fighting systems with all accessories Mussaib Gas Turbine project with South East Texas Industrial Services Company. (2005)
F. Mussaib Gas Turbine project constructing for power units main foundation and 400 KV switchyard civil wors with South East Texas Industrial Services Compay. (2004-2005)