Power Plants
A. Boilers rehabilitation and maintenance (dismantling, retubing, welding, inspection and testing).
- Taking part (contributing) in rehabilitating of boilers of Baiji Thermal power plant.(6X220 MW), (1994 - 1997)
- Taking part in rehabilitating of boilers in Baghdad south power station. (2000-2001)
- Retubing and general maintenance for 40 fire tube boilers in different site inside the country. (1994-2002)
- Rehabilitation of two water tube boilers in North Oil Company. (2001)
B. Installing and making refurbishment for different type of pumps, valves and actuators.
- Refurbishment of main pumps and accessories for Baiji thermal power plant. (1994 - 1997)
- Refurbishment of different types of pumps in Baghdad south power plant. (2000 - 2001)
- Rehabilitation of five raw water main pumping stations in Baghdad, including eight pumps for each. (1994)
C. Installation works for different equipments in Al-Quds Gas Turbine plant, with Dong Fang China. (2000)
D. Rehabilitation of pumps, valves and actuators in Baiji Thermal Power Plant and Daura power station with WIER Services/UK, Bachtel/USA. (2003-2004)
E. Excuting of fire fighting systems with all accessories Mussaib Gas Turbine project with South East Texas Industrial Services Company. (2005)
F. Mussaib Gas Turbine project constructing for power units main foundation and 400 KV switchyard civil wors with South East Texas Industrial Services Compay. (2004-2005)
|
|
 |
|
 |
 |
|
 |
|
Construction of Storage Tanks (Water & Fuel) from 200 to 10000 m3
A. Constructing all fuel and water tanks (200-5000) m3 with all accessories in New Mulla Abdullah Gas Turbine project in Iraq, with CMEC China. (2000)
B. Mussaib Gas turbine project constructing four fuel storage tanks 6500 m3 capacity each, fixed and floating roofs with South East Texas Industrial Services Company.
|
|
 |
|
 |
 |
|
 |
|
Water Treatment & waste water Treatment
A. Installing, operating and maintaining water treatment units in Baiji Thermal power plant.
B. Rehabilitation, installation new equipments in Rustamiyah waste water treatment project (stage 0,1,2) with MPE/Turkey and Bachtel/USA. (2003 - 2004)
C. Rehabilitation, installation new equipments in Alkerkh waste water project (stage 0,1,2) with MPE/Turkey and Bachtel/USA. (2003 - 2004)
|
|
 |
|
 |
|
|